Know your real finish date.
Without calling anyone.
Your engineer updates one task on site. Every downstream dependency adjusts automatically. The finish date updates itself. You just open the app.

But first - what does your Monday morning actually look like?
Sound familiar?
Monday 10 AM. The MIS says everything is on track.
MIS report shows Tower B on schedule. Leadership moves on to other items.
Site engineer mentions the Floor 12 slab slipped 4 days ago. Nobody updated the sheet.
Three subcontractors showed up working off an outdated schedule. Two weeks of rework. The data existed - it just arrived too late.
This happens every single week on projects without real-time tracking.
Now scroll down and watch what the same scenario looks like on Buildrun.
Now watch the difference
Same delay. Zero phone calls. 1.8 seconds.
Click "Simulate delay" below. The slab on Floor 7 slips by one week. Watch every downstream task recalculate automatically - the same thing that currently takes your team an entire day of calls, Excel updates, and a meeting that could have happened on Monday.
Floor 7 slab delayed by 1 week. What happens downstream?
Measured on Suncity Projects, Jewel of India Phase 2 - Jaipur
Suncity Projects. Jaipur.
Jewel of India Phase 2 was planned for 5 years.
It delivered in 3.5.
1.57 million square feet. 56 subcontractors. A flagship luxury residential project in Jaipur. The kind of project where a one-week delay on one floor cascades into a two-month delay on handover.
With Buildrun, Arun Goswami - VP Projects at Suncity - stopped relying on phone calls to know where things stood.
"Construction date is always available. I can identify bottlenecks before time - without calling anyone on site."
Mr. Arun Goswami, VP Projects, Suncity Projects
Prabhat Sah, VP Services, put it simply: daily status updates went from 5-10 phone calls down to 1-2. The finish date was already in the system. No one had to call anyone.
What changes when you stop tracking manually
Every one of these is a real outcome from real projects. Not a feature list - a before and after.
The schedule becomes live. Not last week's summary.
Your planner calls the site, types it into a sheet, shares it next meeting. By then, three more things have slipped. On Buildrun, the engineer logs a 30-second update from site. Every linked task recalculates instantly.
Delays surface on Day 1. Not Day 15.
A slab slips on Monday. Without Buildrun, it shows up in Friday's report. Downstream subcontractors waste a week. With Buildrun, every connected milestone shifts automatically. Leadership sees the new finish date the same morning.
Your team stops chasing. And starts managing.
When status collection is automated, PMs stop being data-entry operators. QC checklists, RFI tracking, vendor coordination, escalation workflows - everything in one system with timestamps, photos, and accountability.
We come to your site. Train your team. Stay until it works.
Our team physically comes to your site. Trains every engineer, every supervisor. 2-4 weeks from sign-off to live. Not a single 'watch this video' onboarding.
Every week you wait is another 8-10 hours lost.
The demo takes 30 minutes. The problem costs you 8 hours every week.
30 minutes to see your project run differently.
We walk you through a live project that mirrors yours - your scale, your project type - and show you exactly where those 8-10 hours disappear. No slides. Just the product running on real data.
Buildrun HQ: Suncity Business Tower, Golf Course Road, Sector 54, Gurgaon.
Managing 25M+ sq.ft. across India.